Another blow for South Korea nuclear plant

Inspectors have found microscopic cracks at a South Korean nuclear power plant that was closed after regulators found forged documents concerning thousands of non-critical parts. The cracks are in the tunnels for the plant’s control rods, and will require about 47 days to repair before the plant can be reopened.

Click here to read the story.

Like this content? Join our growing community.

Your support helps to strengthen independent journalism, which is critically needed to guide business and policy development for positive impact. Unlock unlimited access to our content and members-only perks.

Terpopuler

Acara Unggulan

Publish your event
leaf background pattern

Transformasi Inovasi untuk Keberlanjutan Gabung dengan Ekosistem →