Inspectors have found microscopic cracks at a South Korean nuclear power plant that was closed after regulators found forged documents concerning thousands of non-critical parts. The cracks are in the tunnels for the plant’s control rods, and will require about 47 days to repair before the plant can be reopened.
Click here to read the story.