Japan Atomic Power started feasibility study for nuclear construction in Vietnam

Japan Atomic Power Company has started a feasibility study for the construction of Vietnam’s second nuclear power station contracted with Vietnam Electricity Holding Company (EVN). It will prepare and submit a report to EVN by March 2013.

At the planned construction site in the province of Ninh Thuan in the southern part of Vietnam, Japan Atomic Power will conduct field surveys until March next year on the presence or absence of active faults, submarine topography, tidal currents, water temperature and other subjects. In parallel, the company will prepare component arrangement plans for both the advanced boiling water reactor and advanced pressurized water reactor, which are two types of light water reactors to be proposed by the Japanese side.

EVN will develop a plan for the second nuclear power station based on the report from Japan Atomic Power and submit it to Vietnam’s national assembly for approval. EVN is expected to select a reactor type and plant vendor after the approval. Although Vietnam initially planned to start the operation of the second nuclear power station in 2021, it moved up the schedule a year to 2020 in the country’s 7th electricity plan publicized in July this year.

Like this content? Join our growing community.

Your support helps to strengthen independent journalism, which is critically needed to guide business and policy development for positive impact. Unlock unlimited access to our content and members-only perks.

最多人阅读

专题活动

Publish your event
leaf background pattern

改革创新,实现可持续性 加入Ecosystem →